Avicenna Memorial Hospital
100-bed general hospital with 5 operating theatres and 2 delivery rooms.
View the projectYou see every cost. We agree our fee up front.
SOGO designs and builds hospitals, banks and education buildings in Turkey under one roof, on a cost-plus contract. Every invoice, every subcontractor quote and every line of each payment application reaches the client with its paperwork.
The structure is shown, not amounts. In a real application every line comes with its own documents.
01 — WHY COST-PLUS
Under a lump sum, the contractor prices in every risk it cannot foresee, and that allowance is paid even if the risk never happens. Under cost-plus, the client pays only the documented cost actually incurred and the fee agreed at the start.
| CONTRACT MODEL | Lump sum | Unit price | Cost-plus |
|---|---|---|---|
| Cost visibility | Only the total price is visible. | Unit rates are visible; actual cost is not. | All invoices, quotes and timesheets are open to the client. |
| Risk allowance | Uncertainty is added to the price in advance. | Quantity risk stays with the client. | No risk allowance is priced; actual cost is paid. |
| Scope changes | Become a negotiation over extras. | Need a new unit rate analysis. | Booked at documented cost; the fee rate does not change. |
| Start on site | Waits for complete drawings. | Waits for a complete bill of quantities. | Early packages can start while design continues. |
| Total price | Fixed from the start. | Depends on measured quantities. | Tracked against a target budget; a price cap can be added on request. |
SOGO works under all three models. We recommend cost-plus for corporate projects where design is still in progress, scope may change or a fast start is needed.
02 — PROCESS
Once the design reflects the client's requirements, we present an estimated budget and prepare the master programme in Primavera with a cash flow forecast.
Our fee is written into the contract as [FEE RATE]. Which expenses count as cost and which are covered by our fee is defined clause by clause.
Procurement priorities follow the approved programme. For each package the quotes received are presented in a comparison table; the client approves the choice.
Each month we report physical and financial progress, site photos, and budget and schedule variances. The payment application arrives with invoices and timesheets attached.
Testing and commissioning, provisional and final acceptance are managed; the final account is closed with its documents.
03 — TRANSPARENCY
Open book is not a promise; it is paperwork that arrives on schedule. Your procurement, technical and finance teams decide on their own data.
Quotes for each procurement package are presented side by side. Suppliers and subcontractors are selected with your approval.
Physical and financial progress, labour and material productivity, site photos, with quality, budget and schedule variances.
Every change request is assessed for its effect on quality, time and cost, submitted for your approval and kept on record.
With the budget tied to the programme, you see at the start how much will be paid in which month.
04 — SERVICES
With an integrated technical office and design office, gaps in the drawings are resolved before they become costs on site.
Construction across all trades with professional crews managed by our own technical office, under a cost-plus, unit price or lump sum contract.
Architectural, structural, electrical, mechanical and medical design by our in-house architects and engineers.
Design and tender management, construction management and handover management: budget, programme, procurement, change and contract management.
Architectural, mechanical, electrical and medical consultancy, independent of design and construction work.
05 — PROJECTS
100-bed general hospital with 5 operating theatres and 2 delivery rooms.
View the project
Construction drawings and project management.
Construction drawings, project management and construction works.
Design and construction; interior furniture manufactured in Turkey.
Design and construction works.
06 — FAQ
Work starts with an estimated budget and a cash flow forecast; actuals are reported against that budget every month. Where the budget is firm, a price cap clause can be added to the contract.
To the documented costs defined in the contract: materials, equipment, subcontractor payments and site costs. The rate does not change during the job: [FEE RATE].
With a percentage fee, that is a fair question. That is why every purchase goes through an open quote comparison and your approval. If you prefer, the fee is set as a fixed amount, or a shared savings clause is added to the contract.
Yes. Where drawings are complete and scope is clear, we also sign lump sum or unit price contracts. For corporate projects where design is in progress or scope may change, we recommend cost-plus.
07 — CONTACT
Tell us the type of project and the stage it is at. Our technical office will call you, and at the first meeting we will go through the approach to the estimated budget together.